首页> 外文会议>Euromicro Conference on Real Time Systems >Three obstacles to flexible scheduling
【24h】

Three obstacles to flexible scheduling

机译:灵活调度的三个障碍

获取原文

摘要

The key to the next generation real-time systems is flexible scheduling mechanisms that guarantee hard deadlines and use available spare resources to maximise total system utility. This is a multicriteria scheduling problem. It is argued that common approaches like eager slack usage and mandatory first schemes are not only not optimal but not adequate for a wide class of process models. It is also shown that a late acceptance test model is preferable to an early acceptance test model due to the uncertainty of future behaviour of the system. The discussion is complemented with simulation results.
机译:下一代实时系统的关键是灵活的调度机制,可保证难度截止日期并使用可用的备用资源来最大化总系统实用程序。这是一个多轨道调度问题。有人认为,常见的方法,如急切的懈怠和强制性的第一个方案不仅是最佳的,而且对于广泛的流程模型而不能充分。还表明,由于系统的未来行为的不确定性,优选晚期验收测试模型是早期验收测试模型。讨论与模拟结果相吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号