TRINIDAD TRIPLES ITS LNG CAPACITY ― THE ENGINEERING CHALLENGES AND LESSONS LEARNED

机译:特立尼达三级液化天然气能力 - 工程挑战和经验教训

获取原文

摘要

Work is well underway to triple the capacity of Trinidad's LNG industry. Key decisions to proceed with the plant expansion were made in 1999, the same year as first LNG production. The owners, contractors, and government entities faced the challenge of making this expansion move quickly and equitably on all sides. There is certainly a race-to-market competition for LNG in the Atlantic basin. The speed of this major investment decision surprised almost all interested parties. The market, once identified, required an additional 3+ million tonnes per year in 2002 and another 3+ million tonnes soon thereafter. The engineering challenges in maintaining a low unit cost for LNG and still moving quickly to more than triple the size of this facility are discussed . Lessons learned from Train 1 are incorporated. Little pre-investment was done with the construction of Train 1. Trains 2 and 3 were originally expected to be duplicates of Train 1. However, the development of the upgraded Frame 5D gas turbine provided an opportunity for increased capacity with less incremental cost . Train 1 was "designed to capacity" and therefore the fifteen percent additional power provided by the 5D design created numerous production bottlenecks that had to be overcome quickly and for little added cost. Geotechnical conditions for the expansion presented a new challenge. For Train 3 and the new LNG Tank locations, land reclamation and soil improvement were required to establish ground and a good working platform. With the fast track schedule dictated for the expansion, the project team worked diligently to come up with a land reclamation plan and ground improvement technology that will support the aggressive construction schedule. Trinidad Trainl LNG project demonstrated the economic viability of a single train LNG export plant - the approval of the new Trinidad LNG expansion project will achieve a new standard of lower cost per ton of LNG.
机译:工作进展顺其三倍的液化天然气产业的能力。与植物扩展进行的主要决定是在1999年的一年中进行的,同年作为第一次液化天然气生产。业主,承包商和政府实体面临着在各方迅速,公平地迅速行动的挑战。当然,在大西洋盆地液化液化液竞争。这一重大投资决策的速度几乎惊讶了几乎所有感兴趣的各方。曾经发现的市场需要2002年每年额外的300万吨,此后仅需3亿吨。讨论了在维持LNG的低单元成本和仍然快速移动到三倍以上的工厂的工程挑战是讨论的。纳入了从火车1中学到的经验教训。使用火车的建造完成了一点预先投资1.火车2和3最初预计将重复列车1.然而,升级的框架5D燃气轮机的开发为具有较少增量成本的容量提供了增加的机会。火车1被“设计为能力”,因此5D设计提供的十五个额外电力创造了许多生产瓶颈,必须迅速克服,额外增加的成本。扩张的岩土工程呈现出新的挑战。对于火车3和新的液化天然气坦克位置,建立地面和良好的工作平台需要土地填海和土壤改进。随着快速轨道时间表的扩张,项目团队努力地努力提出土地填海计划和地面改进技术,将支持攻击性建筑计划。特立尼达TRAINL LNG项目展示了一列火车LNG出口厂的经济可行性 - 新的Trinidad LNG扩展项目的批准将达到每吨液化天然气的较低成本的新标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号