首页> 外文会议>Mine Planning and Equipment Selection Conference >OTC 21476--Successful Design and Practices Shaping Up a Robust HPHT Well Completion Concept for Subsea-Horizontal Wells
【24h】

OTC 21476--Successful Design and Practices Shaping Up a Robust HPHT Well Completion Concept for Subsea-Horizontal Wells

机译:OTC 21476 - 成功的设计和实践为海底井井的强大的HPHT完善概念塑造

获取原文

摘要

Several improvements on fluids, equipment, completion design and practices have been successfully implemented in the first subsea well of Morvin HPHT field offshore Norwegian Continental Shelf. These improvements are: 1) Using new heavy weight reduced solid oil-based completion fluid for running the lower completion (predrilled liner) and achieving the expected initial productivity ; 2) Extra well cleaning prior to running the lower and upper completion; 3) A designed predrilled liner combined with open hole swell packers for zonal isolation and HPHT tracer-subs for data acquisition; 4) Downhole barrier being installed as an integral part of the lower completion, eliminating the middle completion ; 5) New HPHT permanentretrievable production packer; and 6) Successful installation of downhole P/T gauge with pig tail connection below the tubing hanger. Completion operation on the first well was completed in 40 days (i.e. 12 days less than the planned days) with no major operational set back, safety and environmental incidents. After the well clean up, the well has been flow-tested up to 1500 Sm3/d (limited by rig capacity) and the well testing evaluation shows that the well delivers productivity as expected. Tracer samples analyses also show good production contribution from both reservoirs being penetrated by 1000 m of 8-(1/2)” horizontal hole section. The HPHT reservoir (819 bar / 162 oC) in Morvin wells requires a different approach to completion design and practices in order to avoid well control incidents, operational problems, and achieve full well integrity during its production lifecycle. It demands the use of non conventional materials and fluids, careful equipment selection which is seldom available off-the-shelf in today’s market, equipment qualifications and new procedures1. This paper describes the original completion concept that was much influenced by well completion experiences from the Kristin field, the world’s first HPHT field to be developed subsea from multi-well templates. The paper then discusses the improvements made from the original completion design, challenges and contingencies.
机译:在莫尔文HPHT领域近海挪威大陆架的第一个海底井中成功地实施了液体,设备,完成设计和实践的几种改进。这些改进是:1)采用新的重量重量减少固体油基完成流体,用于运行较低的完成(预磨损的衬里)并实现预期的初始生产率; 2)在运行较低和上部完成之前的额外良好的清洁; 3)设计的倒进衬里与开放孔膨胀封装机相结合,用于区域隔离和数据采集的HPHT示踪艇员; 4)井下屏障作为较低完成的整体部分安装,消除了中间完成; 5)新的HPHT永久传达的生产包装机; 6)使用管道吊架下方的猪尾连接成功地安装井下P / T仪表。在第一个井的完成操作在40天内完成(即12天,比计划的日子低12天),没有主要的运作,安全和环境事件。在清理井后,井已经过到1500个SM3 / D(受钻机容量有限),井测试评估表明,良好的良好提高了预期的生产率。示踪剂样品分析还显示了从两个储存器渗透到1000米的8-(1/2)水平孔部分的良好生产贡献。 Morvin Wells的HPHT水库(819 BAR / 162 OC)需要采用不同的方法来完成设计和实践,以避免在其生产生命周期中避免良好的控制事件,操作问题和实现全面的完整性。它要求使用非传统材料和流体,仔细的设备选择,在当今市场,设备资格和新程序中很少提供现成的现成。本文介绍了由Kristin领域的井完成经验影响的原始完井概念,这是世界上第一个从多井模板开发海底的HPHT领域。然后,该文件讨论了原始完成设计,挑战和突发事件所做的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号