OTC 21857--Cascade Chinook Subsea Development: The World's Deepest Production Risers

机译:OTC 21857 - Cascade和Chinook海底开发:世界上最深的生产提升管

获取原文

摘要

Located in 8,200 feet water depth, the Cascade & Chinook subsea development risers are the deepest production risers in the world. These are also the first offset free-standing hybrid risers to be installed in the Gulf of Mexico, and the world’s first use of hybrid risers in combination with a disconnectable turret-moored FPSO. This paper presents the unique benefits and challenges associated with using hybrid riser tower technology in the deepwater Gulf of Mexico, based on the experience gained by both client and contractor in executing the Cascade & Chinook riser project. The authors review the history of the Cascade & Chinook riser system, from concept selection through engineering, procurement, construction, installation and pre-commissioning. The most significant challenges and the key project management decisions are highlighted, covering: field layout considerations; strength and fatigue performance; design verification; interfaces with the production facility and subsea infrastructure; procurement and fabrication logistics, and spare materials philosophy; installation engineering and execution; safety and quality management; and regulatory compliance. The project management strategy, and the relationship between client and contractor through the project life cycle, are presented and critically assessed. The paper concludes with an evaluation of the delivery time, cost and project execution risks associated with the hybrid riser concept, and compares this with more traditional deepwater riser solutions, in the context of a deepwater Gulf of Mexico development.
机译:Cascade&Chinook海底发展提升板位于8,200英尺的水深,是世界上最深层生产提升管。这些也是第一个安装在墨西哥湾的首次抵消式混合立管,以及世界首次使用混合立管与可脱离的炮塔系泊FPSO组合使用。本文基于客户和承包商在执行级联和Chinook Riser项目方面获得的经验,介绍了在墨西哥深水海湾的杂交立管塔技术相关的独特效益和挑战。作者审查了Cascade和Chinook Riser系统的历史,通过工程,采购,建筑,安装和预调试,从概念选择。最重要的挑战和主要项目管理决策是突出的,涵盖:现场布局考虑;力量和疲劳性能;设计验证;与生产设施和海底基础设施的界面;采购和制造物流,备件哲学;安装工程和执行;安全和质量管理;和监管合规性。提出和批判性评估项目管理策略和客户与承包商之间的关系,并批判性评估。本文的结论是评估与混合立式概念相关的交货时间,成本和项目执行风险,并将其与更传统的深水提升机解决方案进行比较,在墨西哥发展的深水海湾的背景下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号