首页> 外文会议>Mine Planning and Equipment Selection Conference >OTC 21599--PROINT - Program for Excellence in Integrity Management for EP
【24h】

OTC 21599--PROINT - Program for Excellence in Integrity Management for EP

机译:OTC 21599 - PROINT - E&P诚信管理卓越计划

获取原文

摘要

With the raise of the oil prices most of production installations have their expect life extended. The aging of those installations brought to the companies a different approach regarding integrity, it has been necessary to create a management system capable to deal with this issue. The PROINT is a Program for Excellence in Integrity Management for E&P installations. It started to be developed two years ago due to an internal diagnosis where it was founded an increasing degradation of the integrity of the production installations due to the rapidly growth in numbers of them in E&P in the last decade. The Program is based on PMBoK? Guide (Project Management Body of Knowledge) structure from the Project Management Institute. It has 15 knowledge areas with 58 work processes covering all issues related the management of the integrity. Besides procedures for each work process it has a Technical Guide to all main critical equipment which is a manufacturer manual rewritten by Petrobras technicians including the operation scenarios and the best practices in operation and maintenance. It can be applied to any installation of the Company, Petrobras has decided to start in all topside installations but it will be also implemented in our subsea installations. The main deliverable from the program is a Management System which is capable to comply with all requirements from the authorities and regulatory agencies, besides, of course, all topics related to integrity. The Program will be implemented in the next four years in all Operations and Services Units in 14 phases. At the end, Petrobras can certify each Unit in Integrity Management, if desire.
机译:随着石油价格的提高,大部分生产装置都预计将延长生命。这些装置的老龄化向公司带来了一种关于诚信的不同方法,有必要创建一个能够处理此问题的管理系统。 PROINT是E&P安装完整性管理方案的卓越计划。由于内部诊断,它开始于两年前开发的内部诊断,因为在过去十年中,由于E&P中的E&P中的数量迅速增长,它的内部诊断越来越升级了生产装置的完整性。该计划基于PMBOK?项目管理研究所的指南(项目管理机构)结构。它有15个知识领域,其中有58个工作流程,涵盖所有问题的所有问题相关的完整性。除了每个工作流程的程序外,它还拥有所有主要关键设备的技术指南,该设备是由Petrobras技术人员重写的制造商手册,包括操作场景以及操作和维护中的最佳实践。它可以应用于公司的任何安装,Petrobras决定从所有顶部安装开始,但它也将在我们的海底安装中实施。该计划的主要可交付的是管理系统,该管理系统能够遵守当局和监管机构的所有要求,以及当然,所有与诚信有关的主题。该计划将在14个阶段的所有运营和服务单位的未来四年内实施。最后,如果愿意,Petrobras可以在完整性管理中认证每个单元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号