Super-hot-runs management system

机译:超级热流管理系统

获取原文

摘要

Our project's purpose is to reduce the cycle time of "Push lots". Some lots must be pushed at a faster speed than normal lots. We refer to these lots as Super-HotRuns. For example: If the customer's special requirements includes, pilot lot or FAD Potential-lot,. Our project's purpose is to reduce the cycle times of "Push lots" (Superhot-runs, pilot, hot-lots) to ensure maximum customer satisfaction. According to our historical data, the cycle times of push lots were 1.0 days/layer before we started this project. We made a project goal: by reducing the C/T from 1.0 days/layer to 0.8 days/layer. We set the goal by analyzing the percentage of run, queue, hold. Then tuned a reasonable queue time SPEC to meet C/T target. Hold time reduction is also being deak with in this project. To use a team approach, and we will creat system to management push-lots. This management system includes 5 sub-systems as follow: 1. Starting announcement 2. Forecast system 3. Operating rule 4. Review system 5. Feedback system We have made great progress by using this SPReview system. Our cycle times are kept under 0.8 days/layer, and pilot lots are kept under 1.0 days/layer
机译:我们的项目目的是减少“推批次”的循环时间。必须以比普通批次更快的速度推动一些很多。我们将这些批次称为超级枪支。例如:如果客户的特殊要求包括,飞行员批次或FAD潜力。我们的项目目的是减少“推批量”(超出运行,飞行员,热批次)的循环时间,以确保最大的客户满意度。根据我们的历史数据,在我们启动这个项目之前,推批量的循环时间为1.0天/层。我们制作了一个项目目标:通过将1.0天/层的C / T减少到0.8天/层。我们通过分析运行,队列,持有的百分比来设置目标。然后调整合理的队列时间规范以满足C / T目标。在这个项目中,保持时间也是Deak。要使用团队方法,我们将创建系统到管理推出批次。此管理系统包括5个子系统,如下所示:1。启动公告2.预测系统3.操作规则4.审查系统5.通过使用此Spriew系统,我们已经取得了很大的进展。我们的循环时间保持在0.8天/层下,并将导频批次保持在1.0天/层下

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号