首页> 外文会议>International Conference on AC-DC Power Transmission >Commissioning of the Kii-channel HVDC link. Application of new HVDC technology and operating experience
【24h】

Commissioning of the Kii-channel HVDC link. Application of new HVDC technology and operating experience

机译:KII频道HVDC链路调试。新型HVDC技术的应用和运营经验

获取原文

摘要

The Kii-channel HVDC link is one of the world's biggest HVDC links that utilizes submarine cables and it has been in commercial operation since June 22, 2000. The purpose of the link is a bulk power transmission from a coal-fired thermal power plant to a load center. It also contributes to stabilize and reinforce the power systems in the western part of Japan. Many new technologies, such as DC gas insulated switchgear and large diameter light-triggered thyristors, were applied to this project. Several coordination controls were also applied to the HVDC. Operation data for a year since the commissioning of the HVDC proves its high reliability, showing very high energy utilization of more than 90%.
机译:Kii-Channel HVDC Link是世界上最大的HVDC链路之一,它是自2000年6月22日以来的商业运营。该联系的目的是来自燃煤热电厂的散装电力传输负载中心。它还有助于稳定和加强日本西部的电力系统。应用许多新技术,例如直流气体绝缘开关设备和大直径的光触发晶闸管,应用于该项目。几种协调控制也应用于HVDC。运营数据一年以来,委员会的调试证明其高可靠性,呈现出超过90%的高能量利用率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号