The main scope of this study is to evaluate the amount of the solid wastes in Eskisehir for producing electricity by means of Built, Operate and Transfer (BOT) model. Using this potential, it will be possible to utilize wastes preventing their harmful effects to the environment and making them economically useful. The incineration units thought to be built in Eskisehir will have a capacity of 250 ton/day and produce the energy of 5 MW. The annual production of electricity capacity of this plant will be 43 million kWh. The burning plant is to be composed of only one single unit and the first investment cost of the plant is about 16.2 million USD. In the case of increased waste quantity, the number of unit can be increased to fulfill the requirement in the future. If electricity selling price would be between 0,08 and 0.10 USD/kWh (about 0.1 USD/kWh including taxes for industrial tarriff) then investment cost of 16,2 million USD including operation expense could easily be regained within 5 years.
机译:本研究的主要范围是通过建造,操作和转移(BOT)模型来评估Eskisehir中固体废物的量。使用这种潜力,可以利用废物来阻止对环境的有害影响并使它们在经济上有用。认为焚烧单位建在Eskisehir中将容量为250吨/天,并产生5兆瓦的能量。该工厂的电力能力的年生产将是4300万千瓦时。燃烧厂仅由一个单位组成,植物的第一个投资成本约为1620万美元。在废物量增加的情况下,可以增加单位数以满足未来的要求。如果电力销售价格将在0,08和0.10美元/千瓦时(包括工业休闲税额约0.1美元/千瓦时),那么投资成本为1620万美元,包括运营费用在5年内可以重新获得。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号