首页> 外文会议>International Conference on Reliability, Maintainability and Safety >Field monitoring of a tunnel bridge during jacking construction
【24h】

Field monitoring of a tunnel bridge during jacking construction

机译:顶层隧道桥的现场监测

获取原文

摘要

Frame tunnel bridges are commonly selected when overhead crossing bridges at intersection of railway and highway are built. In these situations jacking construction method is frequently used for the frame tunnel bridge. During construction of tunnel bridges there are some important safety risks. Field monitoring of a frame tunnel bridge, Dengzhuang Bridge, during jacking construction is presented in this paper. The maximum tensile strain is 91με which is smaller than the ultimate tensile strain of concrete. The monitored bridge did not crack during jacking stage. The research results of this paper provide helpful reference for the design, construction and crack prevention of frame tunnel bridges.
机译:框架隧道桥常用于铁路和公路交叉路口的开销交叉桥时。在这些情况下,顶层施工方法经常用于框架隧道桥。在隧道桥梁建造过程中存在一些重要的安全风险。本文介绍了邓庄桥架隧道桥梁隧道桥的现场监测。最大拉伸应变为91με,其小于混凝土的最终拉伸应变。在顶层阶段,被监控的桥梁没有破裂。本文的研究结果为框架隧道桥梁的设计,施工和裂缝提供了有用的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号