首页> 外文会议>Symposium on strait crossings >The challenge of constructing a bridge over the Chacao channel
【24h】

The challenge of constructing a bridge over the Chacao channel

机译:在Chacao渠道构建桥梁的挑战

获取原文

摘要

The paper describes the various possibilities of optimising the design of a new bridge to be built across the Chacao Channel about 1000km south of Santiago de Chile. The bridge shall meet the demands from strong seismic loads, special ground conditions, large tides, strong currents and winds, which tend individually to require design solutions, which are each others opponents. The examinations comprise evaluation of classical suspension bridges and continuous multi-span suspension or cable stayed bridge solutions. The finally adopted concept, a two-main-span continuous suspension bridge, which shall support the future 4-lane road connection, compromises in the most optimal way these requirements. The solution will at the same time also be aesthetically pleasant and cost effective.
机译:本文介绍了优化新桥梁设计的各种可能性,以沿着圣地亚哥岛南部约1000km的赤曲线渠道建造。该桥应符合强大地震荷载,特殊地面条件,大潮汐,强大电流和风力的需求,这倾向于需要设计解决方案,这是彼此的反对者。考试包括评估经典悬架桥和连续多跨悬架或电缆保持桥接解决方案。最后采用了概念,一个双向连续悬架桥,它应支持未来的4车道道路连接,以最佳方式妥协这些要求。该解决方案同时也将在美学上令人愉悦和成本效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号