首页> 外文会议>International symposium on the process metallurgy of uranium >Expansion of the ore treatment plant at Ranger Uranium Mines at Jabiru, NT Australia
【24h】

Expansion of the ore treatment plant at Ranger Uranium Mines at Jabiru, NT Australia

机译:澳大利亚吉鲁·乌兰瓜矿铀矿的矿石治疗厂

获取原文
获取外文期刊封面目录资料

摘要

The Ranger Uranium Mine commenced processing ore in 1980. The original plant designed by the joint venture between Davy and Wright Engineers had been designed to treat 1.3 Mtpa of ore to produce 3500 tpa of U_3O_8 concentrates. The plant operated successfully through good and bad years until the 1995 when the owners of Energy Resources of Australia, North Ltd. (70 percent) decided that there was a market opening to allow expansion of the treatment plant such that it would produce 6000 tpa of concentrate. The desire to produce more concentrates was market driven but the change from the mine Ranger 1 to a new pit Ranger 3 also necessitated the inclusion of the ability to treat more ore. This involved the installation of more grinding and CCD washing capacity. There were some other changes that were to be included into the expansion to overcome operating deficiencies, reduce operating costs and to generally make the operation easier. The Australian engineering company, Kvaerner Davy, was commissioned to provide the EPCM services to the clients, North and the Ranger Operation Group. North Technical Services managed the Project with considerable input from the site operating and maintenance personnel. The site operating personnel commissioned the plant and are successfully operating it at the time of the preparation of this paper. The first part of this paper presents the basic process related activities required to provide the expanded facilities. This includes the flowsheet modifications, equipment changes and new equipment procured. Additionally, a discussion is given regarding the P& ID changes, the piping modifications and the means to install the expanded facilities with a minimum of interruption to the continuing plant operation. A second part of the paper details some of the experiences gained while constructing the expansion and commissioning and operating the expanded plant.
机译:1980年,游侠铀矿开始加工矿石。由戴维斯和赖特工程师之间的合资企业设计的原始工厂设计用于治疗1.3 MTPA的矿石以生产3500 TPA的U_3O_8浓缩物。该植物通过良好而糟糕的年份成功运营,直到1995年澳大利亚能源能源业主,北北有限公司(70%)决定有一个市场开放,以便扩大治疗厂,以便产生6000吨TPA集中。产生更多浓缩物的愿望是市场驱动,但矿山游侠1到新的坑游侠3的变化也需要包含治疗更多矿石的能力。这涉及安装更多的研磨和CCD洗涤能力。还有一些其他更改将包含在扩展中以克服运营缺陷,降低运营成本,并通常使操作更容易。澳大利亚工程公司Kvaerner Davy被委托将EPCM服务提供给客户,北部和游侠操作组。北方技术服务管理项目的工程,从网站运营和维护人员提供了相当大的输入。该网站运营人员委托工厂并在编写本文时成功运作。本文的第一部分介绍了提供扩展设施所需的基本过程相关活动。这包括采购的流程修改,设备变化和新设备。另外,关于P&ID改变,管道修改和安装扩展设施的装置的讨论,以最小的持续工厂操作的中断。本文的第二部分详细介绍了一些在构建扩展和调试和操作扩展植物的情况下获得的一些经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号