首页> 外文会议>International ATS Steelmaking Days Conference >Electric-coke multi energy scrap melting with scrap pre-heating by the Shinseiko plant
【24h】

Electric-coke multi energy scrap melting with scrap pre-heating by the Shinseiko plant

机译:电焦多能量废料熔化,Shinseiko植物用废料预热

获取原文
获取外文期刊封面目录资料

摘要

The Shinseiko pilot plant, 'SSE-E', that use multiple energy source, electric and coke, of 15 t/hr scale was installed to develop highly energy efficient scrap melting process for a total scrap recycling system. The 'SSE-E' was the DC-EAF of equipped the rotary kiln and the shaft furnace for scrap preheating. As a result of pilot trials, electric consumption of 250 kWh/t, coke consumption of 60 kg/t, and operating time within 40 minutes were achieved. The scrap preheating by the rotary kiln was also examined as a pre-research of Shinseiko pilot experiment. These results are research of SSE program in Japanese national program that is called Shinseiko Process Forum.
机译:安装了15 T / HR刻度的Shinseiko Pilot Pland,“SSE-E”,使用了15 T / HR刻度,为总废料回收系统开发出高度节能的废料熔化过程。 “SSE-E”是装备的转窑和轴炉的DC-EAF,用于废料预热。由于试验试验,实现了250千瓦时/ T,焦炭消耗60千克/吨,并且在40分钟内进行操作时间。回转窑的废料还被检查为Shinseiko Pilot实验的预先研究。这些结果是对日本国家计划中的SSE计划的研究,称为Shinseiko Process论坛。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号