首页> 外文会议>International congress on large dams >DETECTION OF ABNORMAL LEAKAGE AT EBERLASTE EARTHFILL DAM
【24h】

DETECTION OF ABNORMAL LEAKAGE AT EBERLASTE EARTHFILL DAM

机译:eBerlaste土填土坝异常渗漏的检测

获取原文

摘要

The Eberlaste earthfill dam was founded on more than 100 m thick layer of silt, sand and gravel alluvions. This report describes the dam and deals with the experience gained in more than 30 years of operation, as well as with detection of abnormal leakage. During these 30 years of operation, two extraordinary events occurred: in 1975, a defect in the cut off wall and, in 1997, a collapse of a relief well. These major events could be detected in time by visual inspections and a comprehensive equipment with measuring devices. After remedial measures, the original situation of flow, and pressure in the foundation had been reestablished.
机译:Eberlaste Itainfill Dam成立于100多米厚的淤泥,沙子和砾石溶剂上。本报告描述了大坝,并在30多年的操作中获得经验,以及检测异常泄漏。在这30年的运作期间,发生了两项特殊事件:1975年,切断墙上的缺陷,1997年,泄漏井塌陷。这些主要事件可以通过视觉检查和带有测量装置的综合设备来检测这些重大事件。在补救措施后,重新建立了基础的原始流动情况和基础的压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号