DETECTION OF ABNORMAL LEAKAGE AT EBERLASTE EARTHFILL DAM

机译:弹力土坝大坝异常渗漏的检测

获取原文
获取原文并翻译 | 示例

摘要

The Eberlaste earthfill dam was founded on more than 100 m thick layer of silt, sand and gravel alluvions. This report describes the dam and deals with the experience gained in more than 30 years of operation, as well as with detection of abnormal leakage. During these 30 years of operation, two extraordinary events occurred: in 1975, a defect in the cut off wall and, in 1997, a collapse of a relief well. These major events could be detected in time by visual inspections and a comprehensive equipment with measuring devices. After remedial measures, the original situation of flow, and pressure in the foundation had been reestablished.
机译:Eberlaste土石坝建在厚达100 m的粉砂,沙砾碎石冲积层上。该报告描述了大坝,并论述了30多年的运营经验以及异常泄漏的检测。在这30年的运营中,发生了两次非同寻常的事件:1975年,隔断墙出现缺陷,1997年,救济井倒塌。这些重大事件可以通过目视检查和带有测量装置的综合设备及时发现。经过补救措施后,已经恢复了原先的流动状况和地基压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号