REDUCING OUTAGE TIME WITH USE OF TEMPORARY REACTOR HEAD

机译:利用临时反应器头减少中断时间

获取原文

摘要

Due to the high cost of replacement power, utilities are trying to maximize the amount of maintenance activities performed while minimizing the duration of their refueling outages. Some of the required maintenance activities that need to be completed may seem to be mutually exclusive, that is, one activity may require the refueling cavity to be flooded while another may require that the reactor coolant level be lowered below the reactor pressure vessel (RPV) flange level. The Temporary Reactor Head (TRH) is designed to seal the RPV from the refueling cavity after the RPV head is removed. With the TRH installed, the refueling cavity may remain flooded while the reactor vessel coolant level is lowered. This combination of controlled water levels allows once mutually exclusive maintenance activities to be performed simultaneously.
机译:由于更换能力的高成本,公用事业公司试图最大限度地提高维护活动,同时最大限度地减少加油中断的持续时间。需要完成的一些所需的维护活动似乎是相互排斥的,即一项活动可能需要加油腔被淹没,而另一个活动可能要求反应器冷却剂水平降低在反应器压力容器(RPV)下方降低法兰水平。临时反应器头(TRH)设计用于在移除RPV头后从加油腔中密封RPV。通过安装TRH,加油腔可能保持淹没,而反应堆血管冷却剂水平降低。这种受控水位的组合允许同时进行相互独家的维护活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号