首页> 外文会议>Iron and Steel Scrap and Scrap Substitutes Conference >A REDSMELT (HOT METAL) PLANT AND THE SELECTION OF PHASE II
【24h】

A REDSMELT (HOT METAL) PLANT AND THE SELECTION OF PHASE II

机译:Redsmelt(热金属)植物和II期的选择

获取原文

摘要

Pacific Iron and Steel is in the investment study phase of the BC Iron & Steelworks project and has assembled an impressive team to accomplish this task. Pacific Iron & Steel has carefully weighed the origination of any loyalties that would impede its flexibility in site selection, iron ore feed, reductant type and source, fuel supply, and iron and steelmaking technology to truly select the best combination of materials and technologies to insure the lowest capital and operating costs, and to assure the long term success of the BC Iron & SteelWorks. The target is to have the first slab produced by the end of next year and to demonstrate the inherent low cost production possibilities of the chosen process route and the ideal location of Ridley Island for this endeavor.
机译:太平洋钢铁和钢铁在BC Iron&Steels项目的投资研究阶段,并组装了令人印象深刻的团队来完成这项任务。太平洋钢铁已经仔细称重了任何忠诚的忠诚,将妨碍其在场地选择,铁矿石饲料,还原剂类型和源,燃料供应和钢铁和炼钢技术中的灵活性,以真正选择材料和技术的最佳组合来保险最低的资本和运营成本,并确保了BC钢铁厂的长期成功。目标是在明年年底之前拥有第一块板块,并展示所选过程路线的固有的低成本生产可能性以及雷德利岛为此努力的理想位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号