首页> 外文会议>International Mine Water Association Congress >Hydrogeological conditions and consequences of closing down the 'Gliwice' colliery
【24h】

Hydrogeological conditions and consequences of closing down the 'Gliwice' colliery

机译:关闭“Gliwice”煤矿的水文地质条件和后果

获取原文

摘要

The main factors that have decided about adopted plan and method of carrying out the process of closing down of the "Gliwice" colliery have been characterised on the background of hydrogeological bed layout and mining conditions. The option of turning the main de-watering system off and complete flooding of the liquidated colliery in the aspect of water risk to the adjacent operating collieries as well as danger to the natural environment because of change of water relationships in the mass rock has been evaluated.
机译:决定采用计划的主要因素和执行关闭“GLIWICE”煤矿的过程的方法,以水文地质床布局和采矿条件的背景为特征。根据大规模岩石中的水关系改变,在水风险的情况下,在水风险方面转向水风险的危险以及对自然环境的危险的选择已经评估了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号