首页> 外文会议>European conference on industrial furnaces and boilers >Possibilities of Increasing Operational Performances of Pp-55 Steam Generators by the Modification of Burners Configuration
【24h】

Possibilities of Increasing Operational Performances of Pp-55 Steam Generators by the Modification of Burners Configuration

机译:通过改变燃烧器配置来增加PP-55蒸汽发生器操作性能的可能性

获取原文

摘要

The paper is based on a practical request viewing the difficulty of achieving rated steam flow in Pp-55 steam generator within a coal-supplied pwoer station. In order to solve the problem a costructional and functional analysis was made of the following: coal-grinding mills, coal dust supply circuits, burners, steam genertors. Analytical studies were made, followed by a solution consisting of: correlation of mill operation with coal grade, dimensional modification of burners and fixing additional burners.
机译:本文基于实际请求,观看在燃煤的PWOER站内实现PP-55蒸汽发生器中的额定蒸汽流动的难度。为了解决问题的解决方案和功能性分析如下:煤粉厂,煤粉供应电路,燃烧器,蒸汽基转基因。制作分析研究,然后由溶液组成的解决方案,然后用煤液,燃烧器的尺寸改性和固定额外燃烧器的相关溶液。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号