首页> 外文会议>European Coke and Ironmaking Congress >REBUILD OF BLAST FURNACE A AT VOESTALPINE STAHL LINZ GMBH
【24h】

REBUILD OF BLAST FURNACE A AT VOESTALPINE STAHL LINZ GMBH

机译:在voestalpine stahl linz gmbh的voestalpine a重建高炉a

获取原文

摘要

In the past few years voestalpine Stahl GmbH in Linz has held a top position among the high-quality flat steel producers. To further strengthen its position in Europe as well as to increase its earning capacity, voestalpine began a long-term investment program entitled 'Linz 2010'. The program focuses, among other targets, on the modernization of the hot metal production. One of the milestones in the course of the first stage was the rebuild of Blast Furnace A in 2004. This pnper gives a review on the major pre-relining activities, the blowdown, rebuild and startup. In 1977, BF A was blown in and the blowdown on July 13, 2004 completed its third consecutive campaign as a 10.5 m, 2454 m~3 w.v. furnace, with a total of 18.9 million tons of hot metal production since the 1994 reline. All the previous campaigns (except the first one without any major intermediate repair) had been determined by advanced wear of carbon blocks in the hearth, finally shaped as the well known "elephant foot"-profile. Relining activities in 1978 (after a break out in the hearth region), in 1985 and 1994 were executed within a four- to six-month downtime. They mainly included the replacement of carbon blocks in the hearth and the lining in the upper stack, of cast iron staves (hearth, tuyere region, bosh, belly and up to the mid shaft), and some minor modifications in the peripheral plant areas as well as regular revamping activities.
机译:在过去的几年里,Linz的Voestalpine Stahl GmbH在高质量的扁钢生产商中占据了顶级位置。为了进一步加强其在欧洲的地位以及增加其盈利能力,voestalpine开始了一个题为“林茨2010”的长期投资计划。该计划在其他目标中重点关注热金属生产的现代化。第一阶段过程中的一个里程碑是2004年重建高炉A.此普培特对主要预先改性活动,排污,重建和启动进行了审查。 1977年,BF A被吹入并于2004年7月13日被打破,并将第三次连续活动完成为10.5米,2454米〜3 W.V。炉子,自1994年以来,共有1890万吨热金属生产。所有以前的竞选(除了第一个没有任何主要的中间修复)的活动都是通过壁炉的先进磨损来决定的,最后是众所周知的“大象脚” - 微量。 1978年在1978年(在壁炉区爆发后)的开展活动,1985年和1994年在四到六个月的停机时间内执行。它们主要包括替代炉膛和上层堆叠的碳块,铸铁笛腰(炉膛,风口区域,腹部,腹部和上部轴),以及周边植物区域的一些微小修改以及定期改造活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号