首页> 外文会议>International Mining Geology Conference >Newmont Goldcorp Tanami Operations - value added through implementation of a new web-based reconciliation database
【24h】

Newmont Goldcorp Tanami Operations - value added through implementation of a new web-based reconciliation database

机译:newmont goldcorp tanami运算 - 通过实现新的基于Web的和解数据库来添加值

获取原文

摘要

Newmont Goldcorp's Tanami Operations are located approximately 550km NW of Alice Springs within the remote Tanami Desert of the Northern Territory. The operation produced 496,000 ounces of gold from its Dead Bullock Soak (DBS) underground operations in 2018. In the same year a new web based reconciliation database was implemented as a model for a companywide process improvement. The system now seamlessly integrates several data sources including the underground dispatch tracking system (PitRam?), the site Metallurgical database, and the Mine Plan into one user friendly interface. This has contributed to significant time savings, a reduction in operation error, and cross functional accessibility of the data. A structured reconciliation process provides a continuous feedback loop to promote operational excellence and support a continuous improvement mindset with respect to block model estimation, reserve design and improving mining practices through shared learning. This paper outlines the three key aspects of the Tanami reconciliation process: 1. The performance of the Resource and Ore Control blocks models over the short (1-month),medium (3-month) and long term (12-month). 2. Stope mining performance; comparing the stope design, through to mining recovery and mill reconciliation, learnings which feed into improving future stope designs. 3. Mine compliance to Reserve and Business Plan; to understand the impact on life of mine planning and short term financial implications. The ultimate goal of the Reconciliation database is to provide transparency and measurement of key metrics that have supported a drive towards continuous improvement across all functions. This has contributed to a reduction in variance between the reserve, ore control model design and the ore received at the process plant. This in turn has facilitated improved grade estimation and accurate short/long term planning and production forecasting.
机译:NewMont Goldcorp的Tanami运营位于北领地的远程Tanami沙漠中大约550公里NW的Alice Springs。该行动于2018年从死亡武器浸泡(DBS)地下业务中生产了496,000盎司的黄金。在同年,一台新的基于Web的和解数据库被实施为公司的流程改进的模型。该系统现在无缝地集成了包括地下调度跟踪系统(PITRAM?),站点冶金数据库和矿井计划的多个数据源,进入一个用户友好的界面。这有助于节省大量时间,操作错误的减少,以及数据的跨功能可访问性。结构化的和解过程提供了连续的反馈回路,以促进运营卓越,并通过共享学习来支持块模型估计,保护设计和改善采矿实践的持续改进思维。本文概述了Tanami和解过程的三个关键方面:1。资源和矿石控制块的性能在短(1个月),中等(3个月)和长期(12个月)中的型号。 2. Stope采矿业绩;比较Stope Design,通过挖掘恢复和碾磨和解,饲料进入改善未来的展示设计的学习。 3.允许遵守储备和商业计划;了解对矿山规划生命的影响和短期财务影响。和解数据库的最终目标是提供透明度和测量关键指标,这些指标支持跨所有功能的持续改进。这有助于降低储备,矿石控制模型设计与过程植物的矿石之间的差异。这反过来促进了改进的等级估计和准确的短期/长期规划和生产预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号