首页> 外文期刊>Engineering & Mining Journal >Newmont Finishes Tanami Power Project
【24h】

Newmont Finishes Tanami Power Project

机译:NewMont完成了Tanami Power项目

获取原文
获取原文并翻译 | 示例
           

摘要

Newmont Mining Corp. announced it has completed the Tanami Power Project in Australia safely and on schedule. The project included the installation of two power stations, a 66-kV interconnected power line, and a 275-mile (450 km) natural gas pipeline. The pipeline was built and will be maintained by Australian Gas Infrastructure Group, while the power stations were constructed and will be operated by Zenith Energy. Capital costs are estimated at approximately $245 million with annual cash lease payments over a 10-year term beginning in 2019.
机译:NewMont Mining Corp.宣布它已经在澳大利亚在澳大利亚完成了澳大利亚的Tanami电力项目。 该项目包括安装两个电站,66千伏互连电源线,275英里(450公里)天然气管道。 管道建成,将由澳大利亚气体基础设施集团维持,而电站建造,并将通过天顶能量运营。 资本成本估计约为2.45亿美元,年度现金租赁付款于2019年开始为期10年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号