首页> 外文会议>Australia's Annual Longwall Mining Summit Conference >Consol Pennsylvania Coal Company Bailey Mine
【24h】

Consol Pennsylvania Coal Company Bailey Mine

机译:Consol宾夕法尼亚煤炭公司Bailey矿

获取原文

摘要

Bailey Mine started in 1984 and is located in Southwestern Pennsylvania within what is known as the Manor-Ninevah Reserve. The mine employs 328 P&M and 84 salaried employees. mining in the Pittsburgh #8 coal seam, the coal is processed at the Bailey Central preparation plant and shipped via rail to various locations, including Consol's coal loading facility on the East Coast in Baltimore, Maryland. Customers number more than 40, both in the United States and abroad. The mine utilizes two longwall mining systems that operate five days a week at three shifts per day. In place continuous miners develop for the longwalls and operate 10 machine shifts per day five days a week. When the mine was initially opened, it was projected to mine 2.5 million clean tons per year. The employees of Bailey Mine finished calendar year 1999 having mined 8,518,670 clean tons; establishing a new annual production record. Slides one and two reflect the last five years annual production and tons per man day.
机译:Bailey Mine于1984年开始,位于宾夕法尼亚州西南部,在庄园九佛储备中。矿井雇佣了328例P&M和84名员工。在匹兹堡#8煤层中采矿,煤炭在贝利中央准备厂加工,通过铁路运输到各个地点,包括在马里兰州巴尔的摩的东海岸的Consol的煤炭装载设施。客户数字超过40人,在美国和国外。该矿井利用两个长壁采矿系统,每周五天运行五天。在不断的矿工中为长墙开发,每周五天每天运作10台机器班次。当矿山最初开放时,它将预计每年矿山250万清洁吨。 1999年贝利矿的员工成立日历年度净化了8,518,670吨;建立新的年度生产记录。幻灯片一两年反映了过去五年年产量和每人日的吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号