首页> 外文会议>Japan-Korea symposium on nuclear thermal hydraulics and safety >Study on the Main Control Room Design for Hamaoka Unit No.5
【24h】

Study on the Main Control Room Design for Hamaoka Unit No.5

机译:Hamaoka单位主控室设计研究5号

获取原文

摘要

The main control room of nuclear power station is important to operate the power station and to promote public acceptance of nuclear power station. To enhance them, there is an idea of high ceiling control room with a gallery room located in backside middle upper floor. The control room is expected to enhance habitability and to offer visitors the fine view of the control room. In this study, psychological and physiological influence of such a high ceiling control room design on operators was investigated first. And then some human engineering requirements for desirable main control room were identified. A control room (ceiling height: about 5 meters) adequate to the requirements was designed, and finally the validity of the design was verified by means of full mockup model room tests. The results of this study are applied to the main control room design of Hamaoka Nuclear Power Station Unit No.5 (Chubu Electric Power Co., Inc).
机译:核电站的主要控制室是运营电站的重要性,促进公众接受核电站。为了增强它们,有一个高天花板控制室,一个位于后侧中楼的画廊室。预计控制室将增强适合性,并为游客提供控制室的美景。在这项研究中,首先调查了这种高天花板控制室设计的心理和生理影响。然后确定了一些人的工程要求对所需的主要控制室。控制室(天花板高度:约5米)设计了适当的要求,最后通过全套模型室测试验证了设计的有效性。本研究的结果适用于Hamaoka核电站4号Hamaoka核电站单元的主控室设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号