Evaluation of Anaheim Adaptive Control Field Operational Test Institutional Issues

机译:Anaheim自适应控制现场运营测试制度问题评价

获取原文

摘要

An overview is provided of the institutional and technical issues associated with the evaluation of the federally sponsored Anaheim Advanced Traffic Control System Field Operations Test. The primary test objectives were the implementation and performance evaluation of adaptive traffic signal control technologies, including an existing second-generation approach, the Split, Cycle, and Offset Optimization Technique (SCOOT), and a 1.5 generation control (1.5GC) approach under development. Also selected for implementation was a video traffic detection system (VTDS). The SCOOT evaluation was defined relative to existing control based on first-generation Urban Traffic Control System (UTCS) but using standard field detectorization rather than that normally associated with SCOOT. Furthermore, SCOOT was installed to operate in parallel to UTCS. The 1.5GC system was planned to be efficiently used to update baseline timing plans. The VTDS was planned for use as a low-cost system detector for deployment is critical areas. Both SCOOT and the VTDS were implemented with some degree of success, with technical and institu-tional issues limiting expected performance. Technical issues that limited SCOOT performance included less-than-anticipated quality of existing communication and controller systems; corresponding institutional factors included inconsistent project management due to staff changes and delays due to contractual issues. Both SCOOT and a modified version of the VTDS are in use in selected areas, with plans for system expansion.
机译:提供了与对联邦赞助的Anaheim高级交通管制系统现场操作测试相关的制度和技术问题的概述。主要测试目标是自适应交通信号控制技术的实施和性能评估,包括现有的第二代方法,分裂,周期和偏移优化技术(SCOOD),以及在开发中的1.5代控制(1.5GC)方法。还选择实现是视频流量检测系统(VTD)。相对于基于第一代城市交通管制系统(UTC)的现有控制来定义SCOOD评估,但使用标准字段检测器而不是通常与脚踏舞相关联的控制。此外,安装脚踏舞以与UTCs平行运行。计划有效地用于更新基线时序计划的1.5GC系统。计划使用VTDS用作部署的低成本系统检测器是关键区域。尺寸和VTD都以一定程度的成功实施,具有限制预期绩效的技术和机构课程。有限的SCOOD性能的技术问题包括现有通信和控制器系统的较少高于预期的质量;由于合同问题,相应的制度因素包括员工的变更和延误,包括不一致的项目管理。两个脚踏车和VTD的修改版本都在选定的区域中使用,具有系统扩展的计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号