首页> 外文会议>International symposium on advances in refractories for the metallurgical industries >Discussion of continuous casting mold flux requirements and development for thin slab casting
【24h】

Discussion of continuous casting mold flux requirements and development for thin slab casting

机译:浅谈薄板坯铸造的连铸模态磁通量和开发

获取原文

摘要

The first thin slab casting plant was commissioned in Crawfordsville, Indiana in 1989. Since that time, the number of thin slab casters has increased to around 20 with several more plants planned in the next few years. As world wide capacity of thin slab/hot strip approaches 40 million tons, the need for expanded markets through improved quality will become increasingly imperative. With the benefit of almost immediate quality feedback, continuous casting mold fluxes are constantly examined by steel makers as a means to improve band surface quality. This paper will discuss current understanding of mold flux requirements for thin slab casting as well as discuss challenges for mold flux suppliers as thin slab steel makers demand higher quality, greater cast speeds, and increased number of steel grade classifications.
机译:1989年,第一家薄薄的板坯铸造厂在印第安纳州克劳福德斯维尔委托。由于那段时间,薄板脚轮的数量增加到20左右,在未来几年内计划更多的植物。随着世界范围的薄板/热带的能力接近4000万吨,通过改善质量对扩大市场的需求将变得越来越重要。在几乎立即质量反馈的益处,钢铁制造商持续检查连续铸造模具助熔剂作为提高带状质量的手段。本文将讨论目前对薄板坯铸造的模具通量要求的了解,以及薄板钢制造商的模具助焊剂供应商的挑战需要更高的质量,更高的铸造速度和钢级分类数量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号