首页> 外文会议>Biennial congress of the International Association for Hydraulics Research >A STUDY ON THE RESERVOIR OPERATION FOR FLOOD CONTROL USING FUZZY CONTROL TECHNIQUE
【24h】

A STUDY ON THE RESERVOIR OPERATION FOR FLOOD CONTROL USING FUZZY CONTROL TECHNIQUE

机译:采用模糊控制技术研究防洪水库运作研究

获取原文

摘要

The objective of this study is to develop single reservoir operation models for flood control using fuzzy control technique, which can improve flood controllability. The feasibility of the developed fuzzy control models in reservoir operation was investigated. The simulated results for the 1984, 1990, and 1995 flood events are compared with historical operation results in view of flood control and disaster prevention of downstream. The fuzzy model developed in this study determines the outflows based on the two conditions : the first one is to consider only two inputs such as reservoir water level and inflow for operation of the existing situations, the second one is that the possible maximum release from each dam does not exceed the allowable design maximum discharge for disaster prevention of downstream area. As the result, it was shown that the suggested models based on fuzzy control technique could reduce both the peak water level and the maximum peak discharge compared with those of historical operation results.
机译:本研究的目的是利用模糊控制技术开发用于防洪的单一储层操作模型,这可以提高防洪性。研究了储层操作中发达的模糊控制模型的可行性。鉴于防洪和防灾下游的防洪和防灾,将与历史运作的模拟结果进行比较。本研究中开发的模糊模型决定了基于两个条件的外流:第一个是考虑储层水位等两个输入,以及用于现有情况的运行,第二个是每个的最大释放大坝不超过下游区域防灾的允许设计最大放电。结果表明,与历史操作结果相比,基于模糊控制技术的建议模型可以减少峰值水位和最大峰值放电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号