首页> 外文会议>Particle Accelerator Conference >Fermilab electron cooling project: engineering aspects of cooling section
【24h】

Fermilab electron cooling project: engineering aspects of cooling section

机译:Fermilab电子冷却项目:冷却部分的工程方面

获取原文

摘要

The Fermilab Electron Cooling project involves interacting a 4.3 MeV, 0.5 A DC electron beam with 8.9 GeV/c antiprotons in the FNAL Recycler Ring. This interaction occurs through a 20-meter long cooling section consisting of 10 solenoid modules. This cooling process would lead to an increase in the Tevatron collider luminosity needed to support RunIIb parameters. There are several important engineering aspects of this cooling section including: solenoid design, vacuum system design, magnetic shielding, support system, and alignment methods. Details of the engineering issues related to each of these areas will be discussed.
机译:Fermilab电子冷却项目涉及在FNAL再循环环中与8.9 GEV / C反辐射的0.5个DC电子束相互作用。这种相互作用通过由10个电磁模块组成的20米长的冷却部分发生。该冷却过程将导致支持RunIIB参数所需的Tevatron撞机亮度的增加。该冷却部分有几个重要的工程方面,包括:螺线管设计,真空系统设计,磁屏蔽,支撑系统和对准方法。将讨论与这些地区相关的工程问题的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号