首页> 外文会议>Asian Regional Conference on Soil Mechanics and Geotechnical Engineering >The impact of grouting to the bottom of piles to the bearing capacity of large-diameter and extra piles setting into rock
【24h】

The impact of grouting to the bottom of piles to the bearing capacity of large-diameter and extra piles setting into rock

机译:灌浆到桩底部的影响到大直径和额外桩的承载力设置成岩石

获取原文

摘要

In the area where hard formation buries deeply, large-diameter and extralong piles set into incompeternt rock with high pressure grouting may raise the bearing capacity and reduce settlement. As a result, it is not necessary to set too deep into hardformation unrealistically. This article approaches the subject through date of comparing two groups of piles experiments in the same project.
机译:在硬形成埋地的地区,大直径和大型桩设定为具有高压灌浆的无能岩石,可能会提高承载力并减少沉降。结果,没有必要将过于深入的硬变化,不切实际。本文通过比较同一项目中的两组桩实验的日期来接近主题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号