首页> 外文会议>European conference on safety and reliability >Time at risk: ALARP trade-offs over time
【24h】

Time at risk: ALARP trade-offs over time

机译:风险的时间:Alarp随着时间的推移权衡

获取原文

摘要

Current regulation in the UK and elsewhere specify upper and target risk limits for the operation of nuclear plant in terms of frequencies of various kinds of accidents and accidental releases per annum. 'As low as reasonably practicable' (ALARP) arguments are used to justify the acceptance or rejection of policy changes that lead to risk between these limits. Much of the ALARP methodology has been developed with the focus is on a single timeframe, usually a yearly risk. However, there is growing interest in risk-informed regulation in which policies extend over several timeframes and distribute the risk unevenly over these, or in policies that lead to a nonuniform risk within a single timeframe (such as maintenance policies). Not all regulators are happy to allow such departure from normal operating conditions. We discuss the problems associated with framing such decisions and supporting them with evidence from Probabilistic Risk Analyses (PRA's).
机译:英国和其他地方的当前监管规定了在各种事故的频率和每年意外释放的频率方面对核电站运作的高度和目标风险限制。 “与合理切实可行的”(ALARP)论点一样低,用于证明对这些限制之间导致风险的政策变化的认可或拒绝。大部分的alarp方法都是通过焦点开发的,而不是单一的时间框架,通常是一年的风险。然而,对风险知情监管的兴趣日益增长,其中政策在多个时间框架上延伸,并在这些时间内或在单个时间范围内(例如维护策略等不均匀风险的政策中的策略分发风险。并非所有监管机构都很乐意允许此类偏离正常运行条件。我们讨论了与框架这些决定相关的问题,并以概率风险分析(PRA)的证据支持它们。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号