首页> 外文会议>Annual international symposium of the international council on systems engineering >Managing the Rework Cycle not the Schedule - A Project Management Paradigm for the Future?
【24h】

Managing the Rework Cycle not the Schedule - A Project Management Paradigm for the Future?

机译:管理返工周期不是时间表 - 未来项目管理范例?

获取原文

摘要

Many projects fail to deliver against their targets because conventional project management techniques are failing to cope with the project's dynamic environment, complex interactions and the multitude of 'soft' / people issues. If conventional techniques do not cope with the complicated factors that affect our larger projects, are there any better methods? This paper demonstrates that better management of the rework cycle and application of dynamic project modelling technology can provide a more robust means of controlling complex projects than many of those in common use today.
机译:由于传统的项目管理技术未能应对项目的动态环境,复杂的互动和众多“软”问题,因此许多项目未能兑换目标。如果常规技术不应对影响我们更大项目的复杂因素,是否有更好的方法?本文展示了更好地管理返工周期和动态项目建模技术的应用可以提供比当今共同使用的许多人控制复杂项目的更强大的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号