【24h】

Managing the Rework Cycle not the Schedule - A Project Management Paradigm for the Future?

机译:管理返工周期而不是进度表-未来的项目管理范例?

获取原文

摘要

Many projects fail to deliver against their targets because conventional project management techniques are failing to cope with the project's dynamic environment, complex interactions and the multitude of 'soft' / people issues. If conventional techniques do not cope with the complicated factors that affect our larger projects, are there any better methods? This paper demonstrates that better management of the rework cycle and application of dynamic project modelling technology can provide a more robust means of controlling complex projects than many of those in common use today.
机译:许多项目无法实现其目标,因为传统的项目管理技术无法应对项目的动态环境,复杂的交互作用以及众多的“软” /人问题。如果常规技术不能解决影响我们较大项目的复杂因素,那么还有更好的方法吗?本文表明,与当今许多常用项目相比,对返工周期的更好管理和动态项目建模技术的应用可以提供一种控制复杂项目的更强大的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号