首页> 外文会议>POWER-GEN Asia Conference >Power Plant Rehabilitation and Modernization in Myanmar
【24h】

Power Plant Rehabilitation and Modernization in Myanmar

机译:发电厂康复和现代化在缅甸

获取原文

摘要

In providing reliable electric power Myanmar committed to the use of Thermal Power Plants to meet the base load generation requirements. Hydro Generation Plants due to their seasonality power production are to be used for Peak Load Generation. To increase Thermal Power Plant capacity and reliability, new capacity is being added but it is not sufficient to meet the current demand during the dry-season. Power Plant Rehabilitation and Modernization ("PP R&M") is being applied to create a greater generation contribution from the existing Thermal Power Plants. In July 2012, refurbishment of a combined cycle unit at Ywama was awarded by Myanmar Electric Power Enterprise ("MEPE"). In August 2013, the overhaul and upgrade of three (3) GE Frame 6B units was awarded. The methodology of PP R&M in the context of Myanmar is presented herein.
机译:在提供可靠的电力缅甸致力于使用热电厂以满足基本负荷产生要求。由于其季节性电力生产导致的水力生成植物用于峰值负荷产生。为了提高火电厂容量和可靠性,正在添加新的能力,但在干燥季节期间满足当前需求是不够的。电厂康复和现代化(“PP R&M”)正在应用于从现有的热电厂创造更大的产生贡献。 2012年7月,缅甸电力企业(“MEPE”)颁发了ywama综合循环单位的翻新。 2013年8月,颁发了三(3)架6B单位的大修和升级。本文介绍了缅甸语境中PP R&M的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号