首页> 外文会议>International symposium on field measurements in geomechanics >Instrumentation program for Boston Red Line Subway tunnel
【24h】

Instrumentation program for Boston Red Line Subway tunnel

机译:波士顿红线地铁隧道仪表计划

获取原文

摘要

An Immersed Tube Tunnel (ITT) will be placed in a dredged corridor across the Fort Point Channel in Boston, MA. Construction is complicated by the existence of active Red Line Subway Tunnels (RLT) located beneath the channel and about 1.8 meters below the base of the ITT. Geotechnical and structural investigations, and numerical studies were performed to evaluate the impacts on the RLT. Pilot programs were conducted to select instruments for monitoring settlements, joint openings, and water flow in the RLT. An open channel type liquid level system 1310-meters long with 125 gages was installed to monitor settlements. More than 700 strain gages and jointmeters were attached to the concrete liner surface using a novel epoxy bonding technique. In situ stresses in concrete were investigated by using a patent pending flat jack method. An Automated Data Acquisition System (ADAS) has monitored more than 900 gages for more than three years.
机译:浸入的管隧道(ITT)将放置在马萨诸塞州波士顿的堡垒点通道的疏浚走廊中。施工通过位于通道下方的主动红线地铁隧道(RLT)和ITT底部下方约1.8米的施工是复杂的。进行岩土和结构研究,并进行数值研究以评估对RLT的影响。进行试验计划,选择用于监测居留区,联合开口和水流的仪器。安装有125个测量的开放式型液位系统1310米长,以监测定居点。使用新的环氧键合技术将超过700个应变计和关节连接到混凝土衬垫表面上。通过使用专利的扁平插孔方法研究了混凝土中的原位应力。自动化数据采集系统(ADAS)监控了超过3年的900多年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号