High speed railway line Cologne to Frankfurt, tunnelling through a landslide area

机译:高速铁路线科隆到法兰克福,隧道穿过山体滑坡区域

获取原文

摘要

The new line Cologne-Frankfurt is the centerpiece of the German and the future European high-speed traffic network and links important national and internatonal long-distance lines (Figure 1). With a planned maximum speed of 300 km/h and seven stops time for travelling will be reduced significantly. At the 184 km long new line a total of 18 bridges (total length = 6 km) and 30 tunnels (total length = 47 km) will be constructed. This report is about one particular tunnel project (Wandersmann-Tunnel North) which is being excavated at the present. Due to several extraordinary geotechnical conditions such as underpassing a highway with a cover of about 15-20 m and driving through a landslide area by means of a large diameter shield machine, the driving is accompanied by an intensive geotechnical monitoring programme.
机译:新线科隆 - 法兰克福是德国人和未来欧洲高速交通网络的核心,链接重要的国家和国际长途线路(图1)。规划的最大速度为300公里/小时,七个停止行驶时间将显着减少。在184公里的长线上,共有18个桥梁(总长度= 6公里)和30个隧道(总长度= 47 km)。本报告涉及一个特定的隧道项目(Wandersmann-Tunnel North),该项目正在当前正在挖掘。由于几种非凡的岩土工程,例如通过大约15-20米的盖子地下通道,通过大直径屏蔽机通过滑坡区域驱动,驾驶伴随着强化的岩土监测程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号