Monitoring system for the control of a large embankment close to failure

机译:监控系统控制靠近失败的大型路堤

获取原文

摘要

The excavation of an exploratory adit through the foundations of a 30 m high embankment at the southern entry of the Mont Blanc road tunnel led to substantial deformations of the portion of fill located directly above the trial adit. Since the embankment was originally formed as an uncontrolled disposal of muck from the Mont Blanc tunnel and not subjected to any construction control, the event brought the outer edge of the embankment into a state of incipient failure. In view of the importance of the embankment which, beyond customs and service areas, incorporates the Mont Blanc tunnel ventilation-intake as well as administrative buildings, a detailed site investigation was carried out and the whole area was instrumented and subject to continuous electronic monitoring of deformations, displacements and pore pressures of the soil foundations. Displacements and deformations were measured both on the ground surface and at depth. The data collected through the monitoring programme are presented with the aim to provide some information on the response of the embankment, foundation soils and groundwater table to the extensive and differentiated remedial measures which were undertaken for stabilizing the embankment toe. Some consideration is also given to the instrumentation itself which, allowing for an immediate return and interpretation of the data, made it possible to follow the behaviour of the embankment during execution of the remedial works on a real-time basis and, subsequently, to assess the impact of the completed works in terms of improvement of stability.
机译:通过在纽伦特公路隧道的南部进入30米高堤的基础上挖掘探索性Adit,导致了直接在试用Adit上方的填充部分的大幅变形。由于路堤最初形成为从蒙特Blanc隧道的不受控制的泥土处置,因此事件将路堤的外边缘带入初期失败的状态。鉴于堤防超出海关和服务领域的重要性,将蒙特Blanc隧道通风摄入量以及行政建筑物,进行了详细的网站调查,整个区域被仪器化并进行了持续的电子监测土壤基础的变形,位移和孔隙压力。在地面和深度上测量位移和变形。通过监测计划收集的数据,旨在提供有关堤防,基础土壤和地下水表的响应提供一些信息,以实现用于稳定堤防脚趾的广泛和分化的补救措施。还考虑了仪器本身,允许立即回报和解释数据,使得在实时基础上的补救作品期间可以遵循堤防的行为,并且随后进行评估完成工程对稳定性提高的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号