Principle and application of instrumentation for the first MRTA subway project in Bangkok

机译:曼谷第一个MRTA地铁项目仪器的原理与应用

获取原文

摘要

The blue line subway of the Metropolitan Rapid Transit Authority (MRTA) is the first subway project in Bangkok. It is about 20km long dual tunnels with 18 subway stations. Construction has been started since mid of 1997. An extensive instrumentation was set up as a safety control not only during construction, but also for the future work. This paper briefly describes the principle and application of instrumentation for the MRTA project. An analysis on data from instrumented load tests was carried out to verify the design of pile capacity and instrumentation results from subway station excavation and tunneling were back analysed to study the soil-structure behavior. The surface ground loss, layering ground deformation and lateral soil displacement during tunneling were recorded and back analyzed by means of FEM method. The lateral movements of subway station walls during basement excavation were also measured and back analyzed. The results of FEM analysis agree with field measurements. This paper proposes the appropriate soil stiffness in terms of strain order for excavations with diaphragm wall in Bangkok subsoils.
机译:大都市快速过境管理局(MRTA)的蓝线地铁是曼谷的第一个地铁项目。它是大约20km长的双隧道,具有18个地铁站。自1997年以来,建设已启动。不仅在施工期间,不仅为安全控制而设立了广泛的仪器,也是为了未来的工作。本文简要介绍了MRTA项目仪器的原理和应用。进行了仪表载荷试验数据的分析,以验证桩容量和仪器的设计,从地铁站挖掘和隧道分析,以研究土壤结构行为。通过FEM法记录隧道隧道期间的表面接地损失,层状地变形和侧向土壤位移。还测量了地下室挖掘过程中的地铁站壁的横向运动并进行了分析。有限元分析结果与现场测量一致。本文提出了在曼谷岩土中振动壁的应变顺序方面适当的土壤僵硬。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号