首页> 外文会议>International symposium on field measurements in geomechanics >Design and execution of reinforcement systems for the discontinuous rock masses underlying an intake dam for a hydroelectric power plant
【24h】

Design and execution of reinforcement systems for the discontinuous rock masses underlying an intake dam for a hydroelectric power plant

机译:用于水力发电厂的进气坝下面的不连续岩体的增强系统的设计与执行

获取原文

摘要

Toppling failure had occurred during heavy floods at a steep clff behind a waterfall of about 28m high and 110m wide formed by rock masses dissected by horizontal and vertical joints. The failure proceeded to the upstream year by year and threatened the stability of an intake dam for hydroelectric power plant situated about 20m upstream of the cliff. In this study, an effective reinforcement system was designed by using DEM considering the impact on the natural beauty of the waterfall. The results of DEM analysis were compared with the measurement results during construction to see the practical usefulness of the DEM analysis., and as for the stable/unstable tendency and the toppling deformation mode, the DEM analytic results agreed well to the measurement results.
机译:在大约28米高的瀑布后面的陡峭CLFF瀑布的大洪水期间发生了倒塌的失败,由水平和垂直接头分开的岩体形成110米。该失败逐年进行了上游年份,威胁到水力发电设备的进气坝的稳定性,位于悬崖上游约20米。在这项研究中,通过使用DEM考虑对瀑布自然美景的影响来设计有效的钢筋系统。将DEM分析的结果与施工过程中的测量结果进行了比较,以便看到DEM分析的实际有用性。并且对于稳定/不稳定的趋势和倒装变形模式,DEM分析结果达到测量结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号