首页> 外文会议>International School of Hydrocarbon Measurement >Measurement station inspection program and guide
【24h】

Measurement station inspection program and guide

机译:测量站检查计划和指南

获取原文

摘要

Today, let's discuss an important phase of everyday planning for Measurement personnel. A test and inspection guide is a corporation's plan to meet government regulations. DOT requires pipelines to have a written operating and maintenance plan. This plan must meet the minimum federal standards and cover various phases of operations. A company may include items above the minimum federal standards but they must operate according to the plan they prepare. In plain words, what you write you must be ready to live and operate by whether they just meet the DOT minimums or exceed the DOT requirements and this becomes the company bible. The last item to remember is that as field personnel you must perform the required inspections, complete properly the administrative records to document and prove that required tests were made. This is an important item as it involves personal honor and your signature is your statement the work was done. Government penalties applied to companies can be very high if the required work is not done, or has not been properly documented. If the work is not done, admit an error was made. It helps with DOT inspections if an explanation is in the file as to why the specific test was not performed, such as "weather prevented transportation offshore" or "station shut in because well is dead".
机译:今天,让我们讨论测量人员日常规划的重要阶段。测试和检验指南是一项符合政府法规的公司计划。 DOT需要管道有书面的运营和维护计划。该计划必须符合最低联邦标准,并涵盖各阶段的行动。公司可能包括最低联邦标准以上的物品,但他们必须根据他们准备的计划运作。用简单的话语,你写的是你必须准备好的才能生活和运作,无论他们是否只是满足点最小值或超过点要求,那么这成为公司圣经。要记住的最后一项是,作为现场人员,您必须执行所需的检查,填写正确的管理记录,以记录并证明所需的测试。这是一个重要的项目,因为它涉及个人荣誉,您的签名是您的陈述。如果未完成所需的工作,或尚未妥善记录,申请对公司的政府处罚可能非常高。如果未完成工作,请承认出错。如果在文件中的解释,它有助于DOT检查,以及为什么未执行特定测试,例如“天气阻止运输近海”或“站关闭,因为井是死亡”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号