Static and Cyclic Load Testing of a 30-inch-Diameter Pile Over a 2.5-year Period

机译:在2.5年期间,30英寸直径桩的静态和循环负载测试

获取原文

摘要

Static load tests were performed on the pile two hours after driving and after four, sixteen, and twenty-nine months of consolidation and setup. The process of consolidation was essentially completed about twelve months after driving, so that the load tests encompass the complete life of a friction pile in highly plastic clays. Upon completion of the static load tests, the pile was subjected to a number of load variations that included cyclic loading in tension above and below a constant bias until failure was indicated by progressive pullout to large displacements. The pile was then subjected to alternate loading to failure in tension and compression to observe the maximum degree of cyclic degradation. Additional variations included studies of the effect of variations in the loading rate and large-displacement loading in compression to evaluate the end-bearing resistance. At the end of the field test program, load, pressure, and displacement data were recorded during pullout of the pile. Data were recorded for over fifty inches of axial displacement as the pile was removed. No significant losses in capacity were observed during pullout. indicating that temporary overload conditions on tension piles may not result in catastrophic failure, particularly if redundancy is provided.
机译:静载试验开车后2小时,经过四年,十六,和29个月整合和设置的桩上进行。整合的过程基本完成开车后十二个月内,从而使负载测试涵盖摩擦桩高塑性粘土的整个生命。在静态载荷试验完成后,将桩进行了许多负载的变化,包括在张力的上方和下方恒定的偏置循环加载,直到故障被指示通过渐进拉出到大位移。然后将桩进行替换加载在拉伸和压缩不遵守环状降解的最大程度。另外的变体包括在负荷率和大位移加载在压缩以评估最终轴承阻力变化的影响的研究。在现场测试程序结束时,负载,压力和位移数据桩拔出期间记录。数据记录超过50英寸轴向位移的桩已被删除。撤离过程中观察能力没有显著的损失。指示在张力桩该临时过载的情况可能不会导致灾难性的失败,特别是如果提供冗余。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号