The Maryland Department of NaturalResources Power Plant Research Program (PPRP) hasevaluated the potential environmental effects ofusing coal combustion products (CCPs) as structuralfill at Baltimore Gas and Electric Company's (BGE)Brandon Woods Energy Business Park. The 466-acre sitecontains topographic low areas, and CCPs have beenplaced at the site since 1982 to raise the site touniform grade and facilitate construction of lightindustrial and warehouse buildings. PPRP studied thesite to determine if the structural fill applicationat Brandon Woods was protective of ground and surfacewater quality. The evaluation was part of PPRP'songoing evaluation of both operating and retired CCPfill sites in Maryland. The study was intended toincrease the understanding of regulators, CCP users,and the public regarding CCP impacts on water quality,and to ensure that this type of beneficial use is aviable application for other sites in the state.Ground water quality conditions were evaluated usingdata collected from the time the facility began CCPfilling operations in 1982, through March 1998. Groundwater quality at the site is monitored in the shallowaquifer, which is generally present 2 to 10 feet belowthe bottom of the CCP fill, and a deep semi-confinedunit 30 to 70 feet below the bottom of the fill. Sulfate,iron and manganese derived from the fill have beendetected in downgradient monitoring wells completedin the shallow aquifer. The extent of sulfate, ironand manganese derived from the fill in the shallowground water is localized and these constituents arenot adversely affecting surface water quality.Furthermore, no sulfate, iron, manganese, or traceelements, such as arsenic and selenium, have beendetected in the deep ground water.The localized extent of groundwater quality impactsbeneath the CCP structural fill and the absence oftrace elements indicate that several sitecharacteristics minimize potential adverseenvironmental impacts from leachate generation. Thesecharacteristics include: 1) a shallow fill thicknessof 16 feet on average which results in dilute leachate;2) attenuation of the dilute leachate in theunsaturated zone; and 3) the presence of buildings andpavement over much of the site which limits the volumeof infiltration through the fill. Furthermore, thestudy illustrates that although structural fills maycause elevated concentrations of iron, manganese andsulfate in ground water, localized impacts by theselow toxicity constituents may be acceptable whenbalanced against the environmental and economic benefits of CCPs use.
机译:Maryland of Naturalresources电厂研究计划(PPRP)占据了煤炭燃烧产品(CCP)的潜在环境影响,作为Bartimore天然气和电动公司(BGE)Brandon Woods Energy Business Park的结构填充物。 466英亩的地形低区域,CCP在现场以自1982年以来已经取得了偏移,以提高现场Tounform等级,促进电动工业和仓库建筑的建设。 PPRP研究了卓越,以确定结构填充Applicationat Brandon Woods是否受到地面和地表质量的保护性。评估是马里兰州的经营和退役CCPFill遗址PPRP'Songoing评估的一部分。该研究旨在促使对监管机构,CCP用户和公众对水质的影响的理解,并确保这种有益的用途是对国家中其他网站的可用应用。地图地收集了地图水质条件从设施开始于1982年开始运营的时间,到1998年3月。在浅时分中,该网站的地下水质量在CCP填充的底部和深度半关注的底部呈现2到10英尺.30至70脚下底部下方。硫酸盐,铁和锰源于填充的源于下降的监测孔,在浅层含水层完成。硫酸盐的程度,衍生自填充在地下水中的硫酸盐是本地化的,这些成分面积不利地影响地表水质。诸如砷和硒等砷和硒,如砷和硒的含量不利地影响。地下水。地下水质量撞击的局部范围CCP结构填充和缺乏特征的表明,几种1位数最小化了潜在的抗浸出生成抗侵害的影响。本种包括:1)平均浅填充厚度为16英尺,这导致稀释渗滤液; 2)饱和区稀释液的衰减; 3)建筑物的存在和在大部分网站上的捕获,这将音量渗透通过填充物限制。此外,作者说明了,尽管结构填充可能升高浓度的铁,但地下水中的锰磺酸盐,毒性毒性成分的局部冲击可能是可接受的,因为禁止CCPS使用的环境和经济益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号