【24h】

ATACS: first phase control system and its experimental test results

机译:ATACS:第一相控制系统及其实验测试结果

获取原文

摘要

The test run of ATACS (Advanced Train Administration And Communications System)~([1],[2],) which is managed by East Japan Railway Company was carried out. ATACS is a radio communication-based train control system. Hitachi, Ltd. developed three field controller sets (a set constructed form a main controller and a sub-controller), two mana gement servers and two sets of a on-board controller for two test trains. Outputs from main and sub-field controllers are mixed and transmitted to vehicles, and these data are verified by the on-board controller for two test trains. Outputs from main and sub-field controllers are mixed and transmitted to vehicles, and these data are verified by the on-board controller. Virtual trains generated in field controllers were also used in field test runs. Open & close control and handover control of communication channels were performed in the field controllers. A hazard state never happened in these test runs.
机译:进行了由东日本铁路公司管理的ATACS(高级列车管理和通信系统)〜([1],[2])的试验。 ATACS是一种基于无线电通信的列车控制系统。 Hitachi,Ltd。开发了三个场控制器组(由主控制器和子控制器构造的集合),两个MANA GELEMENT服务器和两组用于两个测试列车的车载控制器。将来自主和子场控制器的输出混合并传输到车辆,并且这些数据由板载控制器验证两个测试列车。来自主和子场控制器的输出混合并传输到车辆,并且这些数据由板载控制器验证。现场控制器中生成的虚拟列车也用于现场测试运行。在现场控制器中执行打开和关闭控制和交换控制。这些测试运行中从未发生过危险状态。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号