首页> 外文会议>International conference on ecosystems and sustainable development >Restoration of the Hex river to equilibrium morphological conditions
【24h】

Restoration of the Hex river to equilibrium morphological conditions

机译:六角河恢复均衡形态条件

获取原文

摘要

The Hex river near the town of Worcester, South Africa, has a braided character iwth wide floodplains, a steep bed slope and high bed load. In June 1996, one of the highest floods on record caused severe head cutting, scouring the river bed by two metres which caused instability problems at two bridges. A comprehensive hydraulic study has been undertaken to identify the problem causes and impacts, and to establish a long-term solution for river equilibrium and bridge safety. Man's involvement in altering the river include: extensive mining of boulders from the main river channel with the aim of reducing flood levels which was foudn to be the main reason for head cutting, construction of bridges with fixed bed levels, river channel alteration, the construction of groynes on the floodplain, and closing of a major part of the braided system for agricultural development.
机译:南非伍斯特镇附近的六角河拥有辫子的性格IWTH宽泛平移,陡峭的床坡和高床负荷。 1996年6月,记录中最高洪水之一引起严重的头部切割,将河床划洗两米,这在两座桥梁造成不稳定问题。已经开展了全面的水力研究以确定问题的原因和影响,并为河均衡和桥梁安全建立长期解决方案。男人参与改变河流包括:从主要河流渠道的广泛开采巨石,目的是减少洪水水平,这是头部切割的主要原因,桥梁固定床等级,河流频道改变,建筑Groynes对洪泛区,并结束了农业发展编织系统的主要部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号