Reinforcement to the Foundation of the Plant Building of FUSHUN 1st Petroleum Plant

机译:抚顺植物植物建设基础的加固

获取原文

摘要

The plant building of the Xiqiguo Workshop of FUSHUN 1st petroleum plant is located in the north side of the West Surfase Coal Mine, where the geological tectonics and the hydrogeological condition are complicated. The ground deformed suddenly. The plant biulding had suffered damage of different extent; which affected safety production, under these circumstances the grouting technique was adopted to reinforce the foundaton of the plant biulding. According to the geological tectonics and the hydrogeological condition, we selected the round curtain grouting metheod to close the foundation, which can't only improve the hydrogeological condition but also make the grouting size only diffuse into the foundation under the plant biulding , thus cut down material for grouting. The selection is both effective and economical. The construction sequence and the grouting technology were laid down reasonably. The material for grouting and the technical parameters of grouting were selected meticulously. The standard of quality was carried out strictly in construction. Finally the engineering quality was upto the standard. We had fully reached the expected ends, archieved good results that velocity of the surface subsidence reduced 40%. and the velocity of horizontal movement decreased 70%.
机译:抚顺第一石油厂的Xiqiguo车间的植物建设位于西部煤矿的北侧,地质构造和水文地质条件复杂化。地面突然变形。植物生物制品遭受不同程度的损失;在这种情况下,影响安全生产,采用了灌浆技术来加强植物生物制品的田鼠。根据地质构造和水文地质条件,我们选择了圆形窗帘灌浆蜂蜜接近的基础,这不仅可以提高水文地质状态,还使灌浆尺寸仅扩散到植物生物制品下的基础上,从而减少用于灌浆的材料。选择是有效和经济的。建筑序列和灌浆技术合理地下装。精心选择用于灌浆的材料和灌浆的技术参数。质量标准在建设中严格进行。最后,工程质量取决于标准。我们完全达到了预期的目的,占地面积的良好结果,表面沉降的速度降低了40%。水平运动的速度下降了70%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号