首页> 外文会议>International Conference on Environmental Systems >An Evaluation of the Hubble Space Telescope Thermal Design in Preparation for the Final Servicing Mission
【24h】

An Evaluation of the Hubble Space Telescope Thermal Design in Preparation for the Final Servicing Mission

机译:哈勃空间望远镜热设计的评价准备最终维修任务

获取原文

摘要

Having been in operation for over 15 years, the Hubble Space Telescope (HST) had experienced significant changes in both hardware upgrades and operational modes. The changes were necessary to improve performance of some equipment and to replace failed electronics in others. Hardware replacements were done in several servicing missions. To accommodate the change in physical condition of HST, alterations in the way the telescope is operated were also required. The final opportunity to make any hardware changes on HST is during Servicing Mission 4 (SM-4) which is currently scheduled for December of 2007. It is important to make the most appropriate changes in order to ensure that HST will be in good operating condition until its planned termination. In order to provide manifest input to the HST project for the final servicing mission, the HST thermal team must conduct careful evaluation of every single piece of hardware on HST. The objective of the evaluation is to identify components with temperatures approaching or exceeding their operational limits. For those components with temperatures approaching limits, a thermal analysis must be conducted to predict future temperature rise under a given environment. For components with temperatures exceeding limits, thermal analyses are done to advise the HST project on operational alternatives which will maintain them within limit. Because SM-4 will be the last servicing mission to the HST, this evaluation takes on a much more significant role. The thermal team must make sure that the recommended changes will render HST in good working condition thermally until 2015. This paper describes the process of thermal evaluation and planning for HST's final servicing mission. Thermal analysis and temperature predictions are presented.
机译:哈勃太空望远镜(HST)经营了超过15年,在硬件升级和操作模式中经历了重大变化。改变改善一些设备的性能并更换其他设备的性能。硬件更换在几个维修任务中完成。为了适应HST的身体状况的变化,还需要望远镜操作方式的变化。关于HST的任何硬件变化的最终机会是在服务任务4(SM-4)期间,目前安排在2007年12月。重要的是要使最合适的变化,以确保HST将处于良好的运营状况直到计划终止。为了为最终维修任务提供清单输入,HST热团队必须仔细评估HST上每一块硬件。评估的目的是识别与接近或超过其运营限制的温度的组件。对于具有温度接近限制的这些组件,必须进行热分析以预测在给定环境下的未来温度升高。对于具有超过限制的温度的组件,进行热分析以建议HST项目在运营替代方案中,将它们保持在限制范围内。因为SM-4将是HST的最后一个维修任务,所以这项评估需要更大的作用。热团队必须确保推荐的更改将在良好的工作条件下热量呈现HST,直到2015年。本文介绍了HST最终维修任务的热评估和规划过程。提出了热分析和温度预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号