首页> 外文会议>International Pipeline Conferenc >MAIN PRINCIPLES ON ANALYSIS AND DESIGN OF BURIED BALLASTED PIPELINES ON MARSHES
【24h】

MAIN PRINCIPLES ON ANALYSIS AND DESIGN OF BURIED BALLASTED PIPELINES ON MARSHES

机译:泥土埋地埋管管道分析与设计的主要原因

获取原文

摘要

State of stress and deformation of buried oil-gas pipelines under, operation must meet appointed requirements on strength., deformability, general stability, etc. Fulfillment of those requirements while designing main and field pipelines in conditions of marshes and marshy soils is very problematical. The cause lies both in weak knowledge of peat reaction to longitidual and lateral displacements of the pipe and in impossibility on account of that to analyze the pipe state of stress and deformation taking into consideration the joint pipe-soil deformation. Wide research into pipe-peat interaction has been carried out at the Institute of Construction (Republic of Komi, Russia). In the paper there are enumerated main principles on design, analysis and engineering of buried ballasted pipelines on marshes, which have been worked at the Institute. The practical value of the work results for improvement of pipelines reliability under operation is emphasized in the paper, too.
机译:埋地油气管道的压力和变形的状态,运营必须满足指定的强度要求。,可变形性,一般稳定性等。在沼泽和沼泽土壤条件下设计主要和现场管道的要求是非常有问题的。原因在于对管道的长度和横向位移的泥炭反应的弱知识以及不可能考虑到关节管 - 土壤变形的应力和变形的管道状态。在施工学院(俄罗斯Komi共和国)进行了广泛的管泥互动研究。本文枚举了沼泽的埋地镇流器管道的设计,分析和工程的主要原则,这些主要原则是在研究所工作的。在纸质中强调了改善流水线可靠性的工作结果的实际价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号