首页> 外文会议>International Conference on Computers and Industrial Engineering >Scheduling and production planning for a sawmill: A comparison of a mathematical model versus a heuristic
【24h】

Scheduling and production planning for a sawmill: A comparison of a mathematical model versus a heuristic

机译:锯木厂的调度和生产规划:数学模型与启发式的比较

获取原文

摘要

Production planning and scheduling for sawmills poses many challenges. The solution approaches most commonly used to tackle this problem in the forest industry are: simulation, mathematical programming models, and a combination of both. In this paper we compare the results of using a mathematical model versus a heuristic in scheduling and production planning of a sawmill. We developed a mathematical model that takes into account most of the complexities involved in scheduling and production planning of a sawmill, for a one-month planning horizon. One of the main difficulties is that the supply of hardwood lumber pieces can have different diameters, which are not known in advanced. The cutting patterns that can be used depend on the diameter of the lumber piece to be cut. The cutting pattern, on the other hand, determines the products that are produced. Sometimes suboptimal cutting patterns must be used in order to meet the production plan. We compare the quality of the solutions generated by the mathematical model and the heuristic. Several experiments were conducted using data that represents situations faced by a Chilean sawmill.
机译:锯木厂的生产规划和调度构成了许多挑战。最常用于解决森林工业中这个问题的解决方案方法是:模拟,数学编程模型和两者的组合。在本文中,我们将使用数学模型与启发式的调度和生产计划中的启发式进行比较结果。我们开发了一个数学模型,考虑到锯木厂的调度和生产规划中所涉及的大多数复杂性,以获得一个月的规划地平线。主要困难之一是硬木木材的供应可以具有不同的直径,这在先进中不知所述。可以使用的切割图案取决于要切割的木材件的直径。另一方面,切割图案决定了生产的产品。有时必须使用次优切削模式以满足生产计划。我们比较数学模型和启发式产生的解决方案的质量。使用代表智利锯木厂面临的情况的数据进行了几个实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号