首页> 外文会议>Middle East oil show conference >Egypt's first remotely controlled subsea completion: fulf of suez case history
【24h】

Egypt's first remotely controlled subsea completion: fulf of suez case history

机译:埃及首次远程控制的海底完成:苏伊兹案例历史的鸿沟

获取原文

摘要

A case history of the Gulf of Suez Petroleum Company's (GUPCO) first remotely controlled subsea completion is provided. The first completion was for wel GS 373-2, a prviously drilled and tested exploration well located in the south portion of the Gulf of Suez. Subsea technology was utilized to economically justify development of this one well marginal field which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low cost subsera tree was utilized to capture the resources.
机译:提供了Suez Petroleum公司(GUPCO)湾的案例历史首次远程控制的海底完成。第一次完成是为了WEL GS 373-2,这是一个普及苏兹湾南部的令人难以置信的和经过测试的探测探险勘探。利用海底技术在1978年发现的这一井边缘领域的发展经济地证明了这一良好的边缘领域。传统方法被证明是太昂贵的发展,因此利用了低成本子树的应用来捕获资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号