首页> 外文会议>Middle East oil show conference >Egypt's first remotely controlled subsea completion: fulf of suez case history
【24h】

Egypt's first remotely controlled subsea completion: fulf of suez case history

机译:埃及第一个遥控海底完井工程:苏伊士海湾案例史

获取原文

摘要

A case history of the Gulf of Suez Petroleum Company's (GUPCO) first remotely controlled subsea completion is provided. The first completion was for wel GS 373-2, a prviously drilled and tested exploration well located in the south portion of the Gulf of Suez. Subsea technology was utilized to economically justify development of this one well marginal field which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low cost subsera tree was utilized to capture the resources.
机译:提供了苏伊士湾石油公司(GUPCO)的第一个远程控制海底完井案例的历史记录。第一个完工是wel GS 373-2,这是一个位于苏伊士湾南部的经过钻探和测试的勘探井。利用海底技术从经济上证明了该单井的边缘领域的发展,该领域于1978年被发现。传统方法被证明对于开发而言过于昂贵,因此,利用低成本的树皮树来捕获资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号