首页> 外文会议>International Conference on Radioactive Waste Management and Environmental Remediation >ROCKY FLATS SOLAR EVAPORATION PONDS RCRA HYBRID-CLOSURE CASE STUDY
【24h】

ROCKY FLATS SOLAR EVAPORATION PONDS RCRA HYBRID-CLOSURE CASE STUDY

机译:岩石公寓太阳蒸发池塘RCRA混合封闭案例研究

获取原文

摘要

The Solar Evaporation Ponds (SEP)/Operable Unit 4 (OU 4), located at the Rocky Flats Plant (RFP) sixteen miles northwest of Denver, Colorado, is currently undergoing remediation/Resource Conservation and Recovery Act (RCRA) closure in accordance with the Rocky Flats Interagency Agreement (IAG) signed by the U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA) and Colorado Department of Health (CDH) on January 22, 1991. Based on the Phase I (source and soils) RCRA Facility Investigation/Remedial Investigation (RFI/RI) data and interpretations, the DOE and EG&G Rocky Flats, Inc. (EG&G) have selected a permanent surface engineered/isolation barrier as the technological option for remediation of the SEP. The DOE and EG&G will utilize all natural materials to create an impermeable barrier/structure to isolate the waste being left in place from impacting human health and the environment for a minimum of 1000 years. Our rationale for utilizing natural materials is two fold; 1) optimize long term performance of the barrier and; 2) design a structure which will be near maintenance free (passive remediation) for 1000 years. The DOE and EG&G have taken a proactive approach in providing post closure performance assessment for this RCRA closure action. An integrated monitoring system has been designed which will include monitoring the engineered barrier, vadose zone and ground water systems. Rocky Flats will integrate instrumentation into the permanent engineered barrier which will provide early warning of potential liquid migration through the barrier and into the waste zone.
机译:太阳蒸发池(SEP)/可操作单元4(OU 4)位于科罗拉多州丹佛西北十六英里的岩石平底厂(RFP),目前正在接受修复/资源保护和恢复法案(RCRA)关闭1991年1月22日,美国能源部(DOE),美国环境保护署(EPA)和科罗拉多州卫生部(CDH)签署的岩石平面际协议(IAG)。基于I阶段(来源和土壤) RCRA设施调查/补救调查(RFI / RI)数据和解释,DOE和EG&G Rocky Flats,Inc。(例如&G)选择了永久性表面设计/隔离屏障作为修复SEP的技术选择。 DOE和EG&G将利用所有天然材料,以产生不透水的屏障/结构,以将废物隔离,以造成造成的人力健康和环境至少1000年。我们利用天然材料的理由是两倍; 1)优化屏障的长期性能和; 2)设计一个靠近免维护(被动修复)的结构1000年。 DOE和EG&G在提供了对该RCRA闭合动作的闭合性能评估方面采取了积极主动的方法。设计了一个集成的监控系统,包括监测工程屏障,散滤区和地面水系统。岩石公寓将仪器整合到永久工程屏障中,这将提供通过屏障和废物区的潜在液体迁移的预警。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号