Modernized USS/KOBE No.3 Blast Furnace (working volume 50,945 cf), which is equipped with a Paul Wurth Top, automated stock house, coke screening, etc. was blown in on May 4, 1992. Prior to the start-up, various investigations on burden distribution were performed during the filling trial. No.3 Blast Furnace, applying the above results, is being operated successfully.
展开▼